
RE: Task 1.5 ATM PVCs
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
R2 and R9 should only use their physical interfaces. The
solution guide doesn't have R2 with a P2P
sub-interface.
solution guide doesn't have R2 with a P2P
sub-interface.
Regards,
Antonio Soares,
CCIE #18473 (R&S)
[email protected]
Antonio Soares, CCIE #18473 (RS/SP/DC)
am[email protected]
http://www.ccie18473.net
0