DC Lab

guys, 

 

I am about to start my studying for the DC lab.

The kit list i have to play with is as follows

2 X 7ks (only one VDC spare per chassis), Plus i have another 4X 7ks in different sites, again with only one vDC spare per chassis.

2X UCS with B200 M2 blades (around 3 blades per site)

1 X Netapp 8040 (create multiple SVMs)

2 X MDS switches

2 X Nexus 5500

2 X Nexus 2000

My only issues i think are Fabricpath and FCOE. I intended on using rack rentals anyway with INE but i am wondering how much i can cover with the hardware above? 

 

 

 

Sign In or Register to comment.